SDM6T Unboxing, Leveling and First Power-On
Unpacking, transport lock removal, machine levelling, air and power connection, and the first homing cycle — the exact procedure we follow during remote commissioning.
Step-by-step procedures for installation, maintenance and troubleshooting
Unpacking, transport lock removal, machine levelling, air and power connection, and the first homing cycle — the exact procedure we follow during remote commissioning.
Ten minutes a day: chamber cleaning, spindle cone care, dust filter check, lubrication points and the weekly accuracy verification coupon.
How to measure spindle runout with the supplied gauge, re-calibrate the tool probe and recognise the early signs of bearing wear.
Insert burs into the 12-position magazine in the right order, run automatic length measurement and configure tool-life counters per material.
Import the CAMDENT machine profile, configure blank holders, nesting and strategies, then post-process and send the job over LAN.
Recommended feed, spindle load and step-down for zirconia, plus how to avoid chipping on thin margins and how to set the sintering compensation.
A field guide to the twenty most common alarms: air pressure loss, tool probe failure, communication timeout and spindle overload.
Connect the machine to the internet, launch the remote-assist module and share the session ID with a CAMDENT engineer for live diagnostics.
How to insert burs into the magazine and run the automatic tool-length measurement before the first job.
How to remove a worn bur and install a replacement without damaging the spindle cone.
Step-by-step procedures for installation, maintenance and troubleshooting