Machine Installation

SDM6T Unboxing, Leveling and First Power-On

Unpacking, transport lock removal, machine levelling, air and power connection, and the first homing cycle — the exact procedure we follow during remote commissioning.

9 min 12 s · Reviewed by CAMDENT technical support

Step by step

  1. 1
    Clear the crate and move the machine by its marked lifting points
  2. 2
    Remove every transport lock before power is applied
  3. 3
    Level the machine on its adjustable feet
  4. 4
    Connect the air supply and the power cable to the rated supply
  5. 5
    Run the first homing cycle and confirm every axis reaches reference

These guides summarise the standard workflow. Always follow the manual shipped with your machine, and confirm material parameters with CAMDENT technical support before running a material for the first time.